ronieshabrown13
ronieshabrown13 ronieshabrown13
  • 02-12-2021
  • Mathematics
contestada

a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

What element is in period 4, group 12?
Answer number 5 a,b,c,d,e pls thanks
what do you do when you feel burned out? Any self care that you do try to create?​
What is the slope of the line passing through the points (2,-5) and (4, 1)? A 5/4B 3 C 2 D -4/5​
spade realty sold lots for $23240 per hectare . what is total sales values if the lots in hectare were 2,3,4 ?
What happened to Old Major? A. He died peacefully in his sleep. B .Mr. Jones sent him to a neighboring farm. C. Mr. Jones killed him for the meat. D. Mr. Jones
Omar has $660 to spend at a bicycle store for some new gear and biking outfits. Assume all prices listed include tax. He buys a new bicycle for $330.64. He buys
Study the equations: f(x)=11x-5 g(x)=-2x-4 What is h(x) = f(x) g(x)
evaluate this equation (-5)^5/(-5)^-6
im sad and depressed because i just got called to the library to get told i didnt mke the team for the battle of the books