adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

what are three ways you should handle animals
Based on what you know about Russian climates, which city would likely be the most difficult to travel to? Moscow Volgograd Noril'sk Novgorod
can someone help me with this math question I'm really confused (by the way zoom out to see the full image)
suffix word that ends with or
If your target audience is parents, what should you do in your ad for maximum appeal? A.show them your product is exciting. B.Show them your product has value
the process of a liquid converting to a solid is called
how do you simplify algebraic expressions ?
1) what type of irony is the opposite of what is intended said? a) comic irony b) dramatic irony c) irony of situation d) verbal irony 2) what type of irony doe
phenotype. describe at least two
Of these layers of the atmosphere, which is the least dense? A. exosphere B. stratosphere C.troposphere D. mesosphere