A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Does the heroic code expressed in beowulf conflict with a christian sensibility?
How do you add subtract multiply and divide complex numbers and polynomials
Find the difference- (ab+3a+7)- (-5ab-2)
How does the speaker change emotionally from the first stanza to the sixth stanza?
What did President Eisenhower do after the U.S. Supreme Court ruled on Brown v. Board of Education in 1954?
(15 POINTS) Identify an equation in standard form for an ellipse with its center at the origin, a vertex at (13, 0), and a focus at (12, 0).
The only United States floral organization that has a nationally recognized and certified floral-design designation is the
What is the slope of the line on the graph below? A. -1/2 B. 1/2 C. 1 D. 2
What did The Great Compromise allow the Framers of the Constitution to create?
Type the tense of the verb in this sentence. We hiked the mountain after a long ride in a junky bus.